Case Study: Mastering Early Underground Rough-in & Spatial Coordination of Routing to Avoid Conflicts

  • Standardizing underground utility design to ensure accurate completion of electrical, water, and telecom layouts before vertical construction begins
  • Locking underground designs before breaking ground to minimize rework, scope changes, and schedule impacts
  • Aligning design timelines with construction schedules to remove conflicts between underground installation, foundations, and above-groundwork
  • Embedding commissioning from day one with defined testability in the underground design (pressure/leak & continuity tests, mandrel pulls, labeled/QR-tagged routes, GPSaccurate digital as-builts, and accessible test points) to streamline startup, FAT/SAT, and turnover