Case Study: Optimizing Prefab & Modular Field Installation for Faster, Safer Builds

  • Coordinating logistics and delivery schedules tightly with fabrication shops and site teams to enable just-in-time prefab component installation and minimize onsite storage risks
  • Synchronizing multi-trade onsite assembly workflows using BIM and detailed installation plans to reduce clashes, rework, and accelerate overall project timelines
  • Sharing key learnings from onsite installation to ensure minimal disruption to onsite workflows

New Case Study