Case Study: Optimizing Prefab & Modular Field Installation for Faster, Safer Builds

11:00 am - Thursday 12th March 2026

  • Coordinating logistics and delivery schedules tightly with fabrication shops and site teams to enable just-in-time prefab component installation and minimize onsite storage risks
  • Synchronizing multi-trade onsite assembly workflows using BIM and detailed installation plans to reduce clashes, rework, and accelerate overall project timelines
  • Sharing key learnings from onsite installation to ensure minimal disruption to onsite workflows

New Case Study

Speakers:

Vice President of Strategy
U.S. Engineering
President of Construction
U.S. Engineering