Case Study: Simplifying Structural Design to Build Data Centers Faster & Cheaper
- Evaluating options to strip the structure down to essentials to increase design flexibility and use surrounding real estate more efficiently
- Evaluating the impact of the structure on the MEP critical path to ensure electrical and mechanical systems can progress independently from building envelope completion
- Analyzing how structural simplification impacted overall cost, schedule compression, safety performance, and long-term operational efficiency