Andy Tolbert

SVP of Engineering Echelon Data Centers

Andy Tolbert is Senior Vice President of Engineering at Echelon Data Centres, bringing over 30 years of experience designing, building and operating hyperscale data centres across North America and EMEA. He leads globally distributed engineering and operations teams to deliver mission-critical infrastructure at scale — safely, efficiently and with uncompromising reliability. His expertise spans the full data centre lifecycle, from site selection and design through commissioning and optimisation, including deployment of millions of square feet of white space and gigawatts of power. Andy excels at aligning infrastructure strategy with business objectives while championing excellence, operational discipline and leadership development.

Seminars

Tuesday 10th March 2026
Maximizing Prefabrication & Modularization to Expedite Project Delivery
3:30 pm

Speed to market has never been more critical, and prefabrication offers one of the strongest levers for driving productivity and reducing schedules. This session goes beyond theory to give you a step-by-step understanding of how to identify modular opportunities, optimize your preconstruction planning, and mitigate logistical risks to maximize the ROI.

  • Planning prefab by system type to clearly define what can be prebuilt, what requires onsite customization, and how to maximize multi-trade prefab and modular
  • Evaluating the essential prefabrication decisions during design to influence procurement and cost control
  • Developing strategies to avoid oversaturating the prefabricator supply chain through the evaluation on the extent of modularization to available skilled labor, logistics capabilities, and regional factors
  • Leveraging lessons learned from early modularization pilots to identify the key success factors, pitfalls, and best practices for scaling prefab modular data center construction

Right click on the image to save it to your computer.

Wednesday 11th March 2026
Exploring Evolving Design Standards to Balance Flexibility, Scalability, & Speed in Next-Gen Data Centers
9:10 am
  • Balancing repeatable designs with adaptability: how to integrate evolving technology and market changes into current and future builds
  • Developing methods to introduce new cooling systems, AI-specific infrastructure, or design innovations into projects already under construction
  • Designing MEP systems to handle changing density requirements within the same build cycle
  • Forecasting the next 5 years of design changes: from meeting larger demands of AI-driven loads to what’s on the horizon for quantum computing
Andy Tolbert