Bryan Taylor
President of Construction U.S. Engineering
Bryan is President of U.S Engineering Construction. He leads strategy, operations, and project delivery across markets. A graduate of Colorado State University with a degree in mechanical engineering, he began as a Project Engineer in Colorado and advanced to Project Manager and Senior Project Manager before leading the Kansas City Construction division. He is a LEED® Accredited Professional.
Seminars
Thursday 12th March 2026
Case Study: Optimizing Prefab & Modular Field Installation for Faster, Safer Builds
11:00 am
- Coordinating logistics and delivery schedules tightly with fabrication shops and site teams to enable just-in-time prefab component installation and minimize onsite storage risks
- Synchronizing multi-trade onsite assembly workflows using BIM and detailed installation plans to reduce clashes, rework, and accelerate overall project timelines
- Sharing key learnings from onsite installation to ensure minimal disruption to onsite workflows
New Case Study