Chris Parten
Manager Transmission Planning Engineering Arizona Public Service
Christopher Parten is Manager of Transmission Planning Engineering at Arizona Public Service (APS), bringing more than a decade of experience across transmission planning, operations and engineering. Since joining APS in 2015, he has progressed through rotational engineering, transmission planning and transmission operations roles, including Supervisor of Transmission Operations Engineering. Based in Arizona, Christopher combines planning and operational experience with engineering leadership, bringing a utility perspective to discussions on power infrastructure and data center development requirements.
Seminars
- Identifying where grid capacity can realistically support gigawatt-scale data center demand
- Aligning earlier with utilities to reduce infrastructure planning, inspection and implementation delays
- Preparing for incoming NERC and FERC requirements before they affect larger transmission connected projects