Jimmy Cutler

Civil Engineer, Data Center Design Meta

Seminars

Thursday 12th March 2026
Case Study: Meta’s Approach on Planning, Tracking & Reducing Construction Water Use to Secure More Responsible Data Center Delivery
1:40 pm
  • Aligning early with municipalities to secure responsible water sourcing while strengthening local infrastructure
  • Modeling construction water demand accurately and integrating circular water solutions onsite to reduce potable water use through reuse, reclamation, and capture
  • Tracking water use in real time to ensure plans remain active, accountable, and adaptable during construction
  • Optimizing construction decisions continuously to minimize impact as site conditions, sequencing, and climate change