Ryan Wagner

Ryan Wagner

Company: HITT Contracting

Job title: Vice President

Seminars:

Assessing Complex Retrofitting Practices for Liquid Cooling to Improve Integration Within Existing Facilities 3:00 pm

Assessing the infrastructure required when retrofitting liquid cooling into a facility vs in a greenfield project Clarifying considerations for integrating liquid cooling equipment with existing power and networking infrastructure Evaluating best practice in retrofitting while minimizing disruption to avoid disruption to ongoing operations and existing workflowRead more

day: Day One PM - Track A

A Hanson Wade Group Company

© Copyright 2025 Hanson Wade Ltd | Design and site by Event Engine | Hanson Wade Limited is registered in England & Wales, number 06752216.
Registered Office: Eastcastle House, 27/28 Eastcastle Street, London, W1W 8DH.