Sean Farney

Sean Farney

Company: JLL

Job title: Vice President, Data Center Strategy

Seminars:

Panel Discussion: Exploring the Technical Requirements of Direct-To-Chip Cooling to Remain Equipped for Rising Demand 7:40 am

Understanding how direct-to-chip liquid cooling systems differ from traditional air-cooled systems, the types available and how applicable it is to your future projects  Clarifying the expected timeframe for transitioning to liquid cooling to better prepare for upcoming changes Evaluating facility constraints to determine the most suitable liquid cooling system, ensuring seamless integration and optimized performance during constructionRead more

day: Day Two AM

A Hanson Wade Group Company

© Copyright 2025 Hanson Wade Ltd | Design and site by Event Engine | Hanson Wade Limited is registered in England & Wales, number 06752216.
Registered Office: Eastcastle House, 27/28 Eastcastle Street, London, W1W 8DH.