Sloan Sims

Senior Manager- Advanced Technology Project ESI Construction

Sloan Sims is a Project Executive in the Advanced Technology division with Engineered Structures Inc., based in Meridian, Idaho. Previously, Sloan was a Senior Project Manager at Shawmut Design and Construction based in Los Angeles, California, working in the Life Sciences sector across the West Region. Sloan is a Certified Construction Manager accredited by the CMAA, and holds a Bachelor’s Degree in Business Administration from The University of Redlands.

Seminars

Wednesday 24th March 2027
Case Study: Assessing Steel, Precast & Tilt-Up Core & Shell Options to Reduce Delays & Accelerate Enclosure
2:30 pm
  • Bringing trade partners into preconstruction to test steel mill availability, factory capacity, precast lead times and tilt-up feasibility before design is locked
  • Unlocking faster enclosure by redesigning around available materials, premium stock options and alternative core shell approaches
  • Comparing steel, precast, tilt-up and concrete options against site logistics, thermal mass, blast requirements and trade coordination
Sloan Sims