Venkatesh Thumala Janakiraman
Associate Principal | Electrical Engineer Clayco
Venkatesh Janakiraman is an Associate Principal and Electrical Engineer at LJC specializing in mission-critical data center infrastructure. He focuses on rethinking electrical architectures for the scale, density, and speed demanded by next-generation data centers, developing resilient and flexible solutions that connect design intent with constructability and long-term operations.
Seminars
Thursday 25th March 2027
Defining Tenant Power Requirements Early to Improve Preconstruction Planning & Avoid Project Failure
11:30 am
- Clarifying tenant power requirements, equipment packages and rack densities before key preconstruction decisions are made
- Informing trade partner selection, project scheduling and site logistics around early technical requirements
- Anticipating critical requirements early to avoid setting the project up for failure later in delivery