Fibergrate Composite Structures
Fibergrate is a global manufacturer of fiberglass reinforced plastic (FRP) products, setting the standard for high performance composite products. Fibergrate has led the revolution in structural products, away from maintenance-intensive metals and heavy, reinforced concrete products towards the use of advanced composites. Our FRP structural materials provide solutions to many of the limitations of metal and concrete. These solutions include high strength-to-weight ratios, easy installation, significant safety and ergonomic characteristics, and long-lasting, low-maintenance life cycles.