Intelligent Mapping

Intelligent Mapping is a US based technology innovator founded in 2020 with a simple mission: eliminate uncertainty in underground utility & conduit infrastructure. Our device, the PLUM, is pulled through conduit & provides an inches accurate XYZ profile, bend radius analysis & all files needed for CAD/GIS ingestion in real time. A powerful QA/QC process to ensure conduit was built to engineered specifications. This process eliminates most fiber/power cable damages & delays by auditing the conduit infrastructure BEFORE cable is installed.

www.intelligentmapping.com

Intelligent Mapping
Intelligent Mapping