MaxCell
Company Description: MaxCell, a leading brand in the network construction industry, provides flexible fabric innerduct solutions designed for data centers. Engineered to conform to the shape of the cables, MaxCell eliminates wasted conduit space while supporting required bandwidth and a wide range of cable diameters. Its fabric design enhances airflow and cooling efficiency, protects critical infrastructure, and enables scalable growth without new conduit. Easy to install and cost-effective, MaxCell’s the trusted choice for high-density data center environments.