Shoals Technologies Group

For three decades, Shoals Technologies Group has engineered the electrical systems that power utility-scale solar, solving complex field challenges with electrical balance of system solutions built for speed, reliability, and simplicity. Today, our engineering leadership is driving the next wave of electrification, delivering fast, scalable DC architectures for data centers, storage, and AI-driven energy demands. Shoals builds the backbone of modern power infrastructure.

www.shoals.com

Shoals_Master_Logo
Shoals_Master_Logo