Whirlwind Steel

Family-owned and operated since 1955, Whirlwind Steel delivers trusted, end-to-end metal building solutions backed by innovation and experience. With two manufacturing plants and a combined total of over 500,000 square feet of production capacity, we bring scale, speed, and consistency to every project. Our in-house engineering and drafting teams, licensed in all 50 states, work alongside customized BIM tools built on Tekla Structures to ensure seamless collaboration from design through fabrication. Supported by IAS AC472 certification and membership in MBMA and AISC, our solutions are rigorously tested and built for longevity, reliability, and performance on even the most mission-critical projects.

www.whirlwindsteel.com

Whirlwind_Logo
Whirlwind_Logo