Explore the Agenda

9:00 am Registration & Networking

Workshop A

10:00 am Driving Collaboration Across the Value Chain to Deliver a Large Data Center Campus on Time & on Budget

AVP, Black & Veatch
Vice President of Mission Critical, JE Dunn Construction
Southeast Region Practice Area Leader for Critical Facilities, Senior Associate, Gensler

Delivering a hyperscale data center on time and within budget demands seamless collaboration across owners, contractors, designers, and suppliers – yet alignment remains one of the industry’s biggest challenges. This workshop will unpack the proven frameworks and behaviors that transform fragmented delivery into integrated, outcome-driven performance to optimize project execution on your next megacampus.

  • Building the foundations for strong partnerships across owners, contractors, designers, and suppliers from design to align goals, share risk, and streamline decision-making
  • Evaluating the momentum of alternative project delivery methods: what are the best options for my next project to mitigate risk, increase quality and drive sustainable profitability
  • Establishing clear roles and collaborative workflows that integrate the full project team from project start to finish
  • Capturing and applying insights from each phase to refine delivery standards, prevent recurring issues, and shorten deliver timelines on our next megaproject

12:00 pm Lunch Break & Networking

Workshop B

1:00 pm Accelerating Data Center Delivery Through Enhanced Site Security

Mission Critical Sales Program Manager- Liberty Builds, Liberty Builds
Manager, Solutions Architect, LVT

Start the Pre-Conference Workshop Day by building the connections that will shape your experience throughout the event. This structured, fast-paced session introduces you to peers from across the region, helping you spark conversations early that can grow into valuable discussions across both the workshop and the main conference.

  • Shifting site security from reactive response to proactive risk prevention during construction
  • Building trust between general contractors and owners through transparent, verifiable security measures
  • Demonstrating how LVT enhances site protection, continuity, and confidence across complex data center projects

Panel Discussion

2:00 pm Raising Safety & Performance Standards to Build Respectful, High-Trust Workplaces for Women in Construction

Business Development Manager, Span Construction & Engineering
Senior Vice President of Strategy & Operations, Hands-On-Heroes, iMWomen
Senior Technical Program Manager, Microsoft
  • Strengthening safety culture to ensure women feel protected, supported, and confident to do their best work
  • Embedding practical measures to reduce bias, advance women, and create a more equitable and inclusive workforce experience
  • Leveraging strong standards to win work, build client trust, and create high-performing, respect-driven project teams

3:00 pm Afternoon Refreshments & Speed Networking

Start the Pre-Conference Workshop Day by building the connections that will shape your experience throughout the event. This structured, fast-paced session introduces you to peers from across the region, helping you spark conversations early that can grow into valuable discussions across both the workshop and the main conference.

Workshop C

3:30 pm Maximizing Prefabrication & Modularization to Expedite Project Delivery

SVP of Engineering, Echelon Data Centers

Speed to market has never been more critical, and prefabrication offers one of the strongest levers for driving productivity and reducing schedules. This session goes beyond theory to give you a step-by-step understanding of how to identify modular opportunities, optimize your preconstruction planning, and mitigate logistical risks to maximize the ROI.

  • Planning prefab by system type to clearly define what can be prebuilt, what requires onsite customization, and how to maximize multi-trade prefab and modular
  • Evaluating the essential prefabrication decisions during design to influence procurement and cost control
  • Developing strategies to avoid oversaturating the prefabricator supply chain through the evaluation on the extent of modularization to available skilled labor, logistics capabilities, and regional factors
  • Leveraging lessons learned from early modularization pilots to identify the key success factors, pitfalls, and best practices for scaling prefab modular data center construction

Right click on the image to save it to your computer.

5:30 pm End of Pre-Conference Workshop Day