Explore the Agenda

9:30 am Registration & Networking

Track 1: Breaking Into Data Center Delivery

10:30 am Workshop A: Winning Your First Data Center Project by Building the Right Expertise, Credibility & Operator Trust

Senior Technical Program Manager, Microsoft

Breaking into the data center market requires more than general construction experience. Project leaders need confidence that new entrants understand what makes these projects different. Join this workshop to understand how to identify realistic entry points, build credibility through smaller projects, demonstrate the right technical expertise and create the relationships needed to win your first data center project.

  • Identifying realistic entry points into the data center market to start building relationships with owners before pursuing larger projects
  • Understanding which data center types your experience fits, from in-office builds and 1-20MW networking nodes to colocation facilities, hyperscale buildings and full campuses
  • Recognizing why data centers cannot be treated like standard buildings by showing awareness of critical MEP systems, controls, sequencing and handover expectations
  • Demonstrating credibility without a long data center track record by translating adjacent experience into clear evidence of reliability, documentation, billing and delivery discipline

Track 2: Scaling Alternative Water & Power Strategies

10:30 am Workshop B: Pressure Testing Nuclear Reactors to Assess Their Realistic Role in Powering Data Center Growth

Director & Professor, Georgia Institute of Technology

Small modular reactors are being increasingly discussed as a potential solution to the scale of power being consumed by data centers. But before treating SMRs as the answer, owners need to understand whether they are viable for their projects, how realistic the timelines are, and what ownership, regulatory and water related questions still need to be resolved.

  • Assessing whether SMRs can realistically support data center power demand: are smaller modules close enough to viability?
  • Understanding why not all reactors are suitable for data centers, and how traditional approaches need to be weighed up before assuming SMRs are the answer
  • Exploring the delivery and ownership questions around nuclear-powered data centers and how regulatory complexity could affect implementation
  • Pressure testing the water implications of nuclear solutions by considering traditional reactor water demand, closed-loop zero water evaporation designs, and whether SMRs help address community concerns around resource use in Western markets

12:00 pm Networking Lunch Break

Track 1: Breaking Into Data Center Delivery

1:00 pm Workshop C: Proving Owner-Ready Delivery by Demonstrating Cost, Schedule, Safety & Financial Control

Senior Vice President, Rosendin

Project teams are looking for confidence that you can deliver with certainty across cost, quality, schedule and safety, while staying ready for the challenges that will inevitably arise on larger data center projects. Join this workshop to understand what it really takes to deliver, mitigate risk through the right trade partners, and prove your business has the financial stability to take on a data center.

  • Adopting the mindset needed to deliver by being open to challenges, ready for larger project demands
  • Understanding expectations around cost, quality, schedule and safety, and where barriers to entry exist across each of these categories
  • Demonstrating certainty through measurable performance around set project metrics
  • Proving financial stability before taking on larger data center work and its implications

Track 2: Scaling Alternative Water & Power Strategies

1:00 pm Workshop D: Implementing Alternative Water Strategies to Improve Efficiency & Build Community Confidence

Program Manager, Water Data Center Site Development, Meta
Technical Program Manager - Utilities & Infrastructure, Google
maikke, Amazon Web Services
Water Program Manager, Meta
Technical Program Manager, Water/Wastewater Infrastructure, Google
Manager Utility Infrastructure Strategy, Google

Water use is becoming one of the most sensitive challenges for data center development, particularly in arid climates like Arizona and Nevada where water rights, water stress and public perception are harder to navigate. Join this workshop to explore how to reduce water consumption and address concerns from utilities, regulators and local communities.

  • Matching cooling technologies to local water stress by using water risk analyses and right sizing the water footprint of the data center to the area
  • Managing the difference between short-term water demand and lower long-term operating water use by designing infrastructure that can flex around site-specific water, wastewater and utility constraints
  • Navigating water rights, regulatory frameworks and permitting timelines for alternate and reclaimed water sources