Audience Discussion: Navigating Utility & Substation Upgrades to Enable Reliable Power & Connectivity
- Comparing substation technologies, such as air-insulated vs gas-insulated, based on site constraints, cost, and equipment availability
- Mapping and coordinating necessary off-site and on-site utility upgrades to seamlessly connect to existing gas lines, transmission lines, and fiber networks
- Assessing upgrade costs with a focus on long-term savings, scalability, and minimizing future retrofit expenses